Notable events in the Pine Point Property’s history are outlined in the following chronology:

2012

Tamerlane Announces Updated NI 43-101 Technical Report on the R-190 and Five other Deposits at Pine Point

Tamerlane Announces 12 Million Tonnes of additional Reserves as a result of a NI 43-101 Technical Report on the N-204 Deposit

 

2011 NI 43-101 document posted to SEDAR for the N-204 deposit, announcing new indicated and inferred resources.

 

2010 Tamerlane commenced and completed a 24-hole confirmatory diamond drill program at the N-204 deposit at the Pine Point Project.

 

2009 Tamerlane receives Water Licence for its Pine Point Project.

 

2008 Tamerlane receives Land Use Permit for its Pine Point Project

 

2006 Tamerlane Ventures Inc. acquires remaining 40% interest in Pine Point property claims.

 

2004 Tamerlane Ventures Inc. acquires 60% interest in Pine Point property claims.

 

2001 Karst Investments LLC stakes Pine Point property claims.

 

1991 Mill, town site and railroad are removed.

 

1987 Cominco Ltd. shuts-down the Pine Point Mine mining and milling operations due to:
  • Extended mill haul distances
  • Westerly plunge of deposits
  • Increased water pumping costs
  • High town maintenance costs
  • Changed operating focus

 

1964-1987 Cominco Ltd. conducts mining and milling operations.

 

1961-1964 Government constructs railway.
Northern Canada Power builds 21 megawatt hydroelectric plant.

 

1948-1955 Cominco Ltd. conducts major exploration.

 

1929 Northern Lead Zinc Co. conducts work program.

 

1898 Claims are staked on oxidized sulfide outcrops.
 
 