|
Mining Method & Technology |
|
Tamerlane’s Pine Point Project (PPP) will extract one million tonnes from the Pine Point Property’s R190 zinc/lead deposit utilizing an innovative combination of basic and technical mining methods. Mining the R190 deposit will confirm the use of: • A portal / decline for ore body access and underground bulk mining • Freezing for groundwater control • Truck haulage of ore • Dense Media Separation (DMS) for upgrading low grade deposits
|